No | Nama Peserta | NPWP | Harga Penawaran | Harga Terkoreksi | Harga Negosiasi | |
---|---|---|---|---|---|---|
1 | CV.TRIJAYA ENGINEERING | 75.043.539.8-323.000 | Rp. 51.843.000,00 | Rp. 51.843.000,00 | Rp. 51.843.000,00 | |
2 | CV. Prawita Utama Konsultan | 31.697.070.6-322.000 | Rp. 51.912.300,00 | Rp. 51.912.300,00 | Rp. 51.912.300,00 |